The preparation work before starting the double-shaft shredder is the key to ensure the safe and efficient operation of the equipment.

Steps
1. Pay attention to safety matters: generally, before the equipment is turned on, a simple inspection is needed to check whether there are external interference factors in the equipment and whether all components are operating normally, so as to avoid abnormal situations after the equipment is turned on and endanger personal safety.
2. Check the appearance: make sure there is no crack in the machine body, no notch in the blade and no looseness in the fasteners (such as bolts).
3. Lubrication system: lubricate bearings and gears according to the instructions.
4. Electrical connection: Make sure the wires, motor wiring and electric control cabinet are normal.
5. Lubrication and oil quantity: ensure the lubrication of the reducer.
6. Equipment installation: confirm that the installation, rotation direction and cutter are normal.
7. No-load startup is appropriate: when the plastic shredder is started, it is more appropriate to leave the equipment in the no-load state, that is, start the machine to warm up first, and then start packing operation after the rotation speed is stable. In this way, the preheating effect and operation effect will be better for the equipment itself.
8. Fastening in place: For example, the screen parts should be firmly installed, the sealing parts should be properly handled, and the bolts should be fastened in place to prevent material leakage. Avoid problems or abnormal sounds during operation.
Epilogue
In short, when using the double-shaft shredder, the above aspects need to be checked and operated before starting to ensure the normal operation of the equipment. In addition, if the bearing or motor is found to be abnormally hot during operation, the feeding should be stopped immediately and the problem should be investigated; If the situation is serious, you need to contact the manufacturer for handling.