Feed grading will affect the output of equipment. Today, let’s talk about the situation of putting large pieces of materials into the crusher production process.
If large pieces of materials are often thrown into the crushing cavity, once the size exceeds the specified size, the materials may accumulate at the entrance of the crushing cavity and cannot enter the cavity for crushing.
In another case, although the materials can enter the crushing cavity, they are mostly large pieces of materials with critical values within the standard range. At this time, although crushing can continue, large pieces of materials occupy a large space when crushing, and the gaps between materials are also large, and there is no small-sized material to fill the gaps, which is likely to lead to a decrease in output. Therefore, during the operation of the equipment, it is necessary to feed within the specified range.
Standardized operation can prevent unnecessary accidents. At the same time, strictly implementing the plan planned by technicians can not only ensure the output well, but also avoid the production loss caused by downtime due to irregular operation. If you encounter similar problems, you can seek solutions from the above angles. I hope everyone can solve the problem smoothly when they encounter the same fault.